Research and TPC-1751T TPC-1751T H-E3BE J3AE touch all-in-one 17 inch industrial tablet dual network port

  • Unit Price:$1675.54
  • Wholesale Price:
    Quantity Price (Per lot)
    1 - 3
    4 - 6
    7 - 10
    11 - 15
  • Item#:592693197931
  • Location:China
  • Selected:loading
  • Quantity: (19884 available)
  • Total price:
New item added to your Shopping Cart
You now have 10 items in your Shopping Cart.
 
FacebookTwitterGooglePinterestStumbleUpon
 
The brand:
ADVANTECH RESEARCH
The Model:
TPC-1751T-E3BE
Memory Capacity:
4GB
Hard disc capacity:
60GB
It's a color.:
Brand new.
after-sales service for the sale of the:
The National Union of the Union
Place of origin:
Other overseas regions in the area of
The application of the brand:
Intel Intel
The desktop computer Intel model of the desktop computer:
Saiyan 3
Type of memory:
DDR3
The hard disc interface:
SATA3
The speed of the hard disc is:
7200 turn to the next
The graphics card interface:
AGP
Type of sound card:
6
The presence of the capacity of the:
1GB
Type of disc player of the type:
No optical disc machine
Color classification of the color:
TPC-1751T-E3BE (bare muscle) TPC-1751H-E3AE (bare muscle) TPC-1751T-J3AE (bare muscle) TPC175
Type of main machine shell:
The standard host shell is a
weight of a weight:
2 5kg and above in the
The same city service to the city:
The same city logistics home is worthy of the government
The type of the package:
Official Peudubbing of the
Energy efficiency levels:
No.
Type of chip:
HD5970
Type of graphics card type:
Intel HD Graphics (Bay Trail) for the first time
Type of display:
The flat panel display
The operating system:
The Windows 7 of the
CPU type:
Intel Ling moves the E3845 for the E3845
Solid hard disc capacity in a solid state:
120G
Gross weight.:
6kg
The size of the packaging:
620x580x350mm
The time of the listing:
09/08/2020
The size of the screen:
At 17 inches, the
The energy efficiency preparation number of the case:
No.
The warranty period is in the:
2 years on the
Choose region:
Choose shipping method:
    Yoycart on :       Facebook       Pinterest      Twitter