High Group Raw Hu Spicy Soup Carefree Town Henan Special Production Hu Spicy Soup Stock Powder With Matching Vegetable Speed Eating Hu Spicy Soup Zhengzong

New item added to your Shopping Cart
You now have 10 items in your Shopping Cart.
 
FacebookTwitterGooglePinterestStumbleUpon
 
Date of production:
2023 01 01st to 2023 06 05th
The production license number:
SC10741162200539
Product Standard Number of Products:
DBS 41 006-2015 for the duration of the
The name of the factory:
Henan Hu Third Sister Food Co., Ltd.
The site of the plant:
West China County West Industrial Zone Industrial Four Road North Side
The manufacturer's contact details:
13356098655
The distribution table:
A hotter of hotter soup
The storage method:
At normal temperature
Shelf life:
360
Food additives:
A hotter of hotter soup
The brand:
The high group gave birth to the
The series:
300g
Place of origin:
The Chinese mainland
The province:
Henan Province
The city.:
The City of Zhou Kou
Taste.:
Spicy 300 gr 4 Pack cooking 48 bowls of slightly spicy 300 gr 4 packs cooking 48 bowls 300 gr slightly spicy 2 packets of spicy 2 packs 300 gr 5 scents no spicy three packs 300 gr 5 fragrant and spicy and each one
Type of packaging:
bagged the bag
Whether it is an organic food or not:
No.
The way it is packaged:
Packaging in the
The net content of the:
102g
Choose region:
Choose shipping method:
    Yoycart on :       Facebook       Pinterest      Twitter