From 2026-02-09 to 2026-02-24 is the Chinese new year holiday, the international shipping company will stop working during that
time.
As it takes 2-5 days from supplier to our warehouse. The orders after 2026-02-04 will be sent out on 2026-02-24
One hole two holes of four holes six holes high-end one hole high-end two holes high-end four holes high end six-hole water bath boiler temperature-controlled meter oil bath temperature-controlled instrument integrated water bath boiler table water bath boiler temperature-controlled instrument Double Xianno Sea water bath temperature-controlled
The cargo number.:
91
The contents of the renovation and construction work:
The installation works
Choose region:
Choose shipping method:
Items weight estimation 0 g, subject to actual weight
Calculated shipping includes heavy logistics. Order more, shipping costs will reduce
to 50% discounts!
You can advise shipping services including DHL, ocean shipping, UPS, Fedex, pls contact us!